OSEHRA Forum Sprint 4

OSEHRA Forum Sprint Four, the first of Milestone B, was a long sprint (three weeks, 25 August to 12 September) to work around the OSEHRA Summit. This sprint started into the challenge of ensuring required patches are properly identified and checked. This is a safety issue, since the list of required patches helps ensure that patches are not installed out of order, which could cause corruption of the data and/or algorithms.
 
The Patch Module has generally avoided referring to whole-number versions as 22.0, whereas KIDS has required it.

This week in Visualization OSPG

On Thursday afternoon's teleconference of the Visualization Work Group from 1:00 p.m. to 3:00 p.m. EDT, we will discuss the current status of the production version of VIVIAN; certification status; progress on the DBA database; and the current product backlog.

This week in Visualization OSPG: VIVIAN sprint retrospective and planning

This week's teleconference of the Visualization Work Group on Thursday, April 10, from 1:00 p.m. to 3:00 p.m. EDT, will feature a retrospective of the first production sprint of the VIVIAN visualization tool and planning for the second production sprint.

‘It’s the eye of the tiger, it’s the thrill of the fight…’ [Survivor]

So it seems that with two Sprints under our belts we’re ready to take on another!  Sprint 2 really let us hit the ground running, and Sprint 3 is looking like it will put us in a really stable place in terms of what we can offer for a refactored Problem List module.

Some of the high-level success of Sprint 2 were: