Thanks to all who attended the extended Certification Work Group meeting today.  We had a very productive call with two reviews being performed over the two hour call:

There was also mention of the shutdown of gitorious.org which is a site thatcontains mirrors of the OSEHRA Repositories.  This website will be shut down at the end of May, we are determining if another mirror to replace it is necessary and where it would reside.  

 

As with other final reviews, this meeting was recorded and can be accessed at the following link:  https://osehra.webex.com/osehra/lsr.php?RCID=9db334150044e8575538b6011a6738d0
 

Due to some contractual obligations, there may be an out-of-cycle call for the IE-MHV submission in the upcoming weeks.  We will give as much notice as possible if the call is to be held.  Please keep an eye out for that email.  If no out-of-cycle call is scheduled, the Final review is scheduled for the next CWG meeting on April 28, 2015.

 